CyrusOne Building 1 and 2 Data Center
Chandler, Arizona
Contractor: DPR Construction
Architect: Corgan
Size: 101,500 SF (building 1), 182,944 SF (building 2)
Services: Pre-Construction, Estimating, Project Management, Value Engineering Design-Assist, Steel Fabrication, Steel Erection
These one and two-story facilities house approximately 284,000 SF of Data Center Space. The steel-framed building consists of wide flange and steel joist steel framing with concrete tilt perimeter walls.